│ Wooden Deck
Bo Grandahl built a huge 200 square metre wooden deck, standing on 150 of our GroundPlug® TwisterTM M12/750mm screw piles. The deck is built all the way around the house and includes a large staircase, also standing on GroundPlug® TwisterTM screw pile foundations.


Project Type
200 m2 wooden deck
Soil Type
Medium sand
Installation Time
5 hours
Manpower
2 people
Access to Construction Area
Full access
Installation
Cordless, handheld impact wrench
Project Type
200 m2 wooden deck
Soil Type
Medium sand
Access to Construction Area
Full access
Manpower
2 people
Installation
Cordless, handheld impact wrench
Installation Time
5 hours
With 150 screw piles installed and assembled in just five hours, Bo confirms that working with screw piles is much faster and more efficient than concrete foundations. Just 2 minutes in labour time per foundation! We think that’s hard to beat with other solutions.
Here is what Bo had to say about his building experience:
“Fantastically easy to work with. Easy to adjust as needed in the project. It has also saved us a lot of time on foundations, there have also been places where cast foundations would not have been possible at all.”
– Bo
Quick and easy installation with a hand-held impact wrench
Our engineers calculate each of your projects individually
No digging and moulding required at all
Quick and easy installation with a hand-held impact wrench
Our engineers calculate each of your projects individually
No digging and moulding required at all
Foundation That Doesn't Compromise on Quality
- Manufactured from 100% galvanised steel
- Strong, durable and resistant to rust and harsh environments
- Designed and engineered in Scandinavia