![]()
GroundPlug®TwisterTM M12
GroundPlug®TwisterTM M16
GroundPlug®TwisterTM M20
![]()
![]()
![]()
GroundPlug® HETM 2500mm
GroundPlug® HETM 5000mm
GroundPlug® HETM 8000mm
GroundPlug® HETM 9000mm
![]()
NOTE: Can ONLY be delivered to a business address due to the weight. If your screw piles are being delivered to a residential address, you must place a separate order for this impact wrench to be delivered to a business address (e.g., your workplace).
Milwaukee Impact Wrench (X-Large) for driving in GroundPlug® TwisterTM M16 and M20 screw piles.
Continuous torque of 2,576 Nm.
Includes sockets M12/19mm, M16/24mm, M20/30mm, and an extension bar.
GroundPlug® TwisterTM screw piles are most effectively driven into the ground with a good impact wrench. If you want to get the foundations into the ground as quickly and easily as possible, you should choose a battery-powered impact wrench. It drives the foundations into the ground in a flash.
If you do not have access to an impact wrench, you can rent an efficient Milwaukee Impact Wrench from us, which is suitable for GroundPlug® TwisterTM M16 and M20 screw piles. Choose a rental period of up to 2 weeks.
The impact wrench will be delivered no later than the day before your rental period begins and must be returned no later than the day after your rental period ends.
Packaging and return shipping are included.
£ 19,20 – £ 201,60 incl. vat
Whether you have questions regarding your project, terrain conditions, or simply want to know more about GroundPlug, please reach out. We’re glad to help.
Calculate your own deck project within minutes!
Edit dimensions, pick your soil, add supporting walls, and so much more!
Did you know that GroundPlug has the market’s largest range of steel foundations?
Have a look at our series for multi-storey construction, infrastructure and industrial construction.
Are you planning a construction project? Are you thinking of choosing a screw pile footing for your project? Foundation installation has never been so easy. Just fill in the form and we will pre-calculate your foundations needs and send you a quote within 24-48 hours. Offer accepted? We’ll draw up your plan sketch and ship out your screw piles directly to the building site, your home or your office.