Complete more projects
With GroundPlug® Screw Pile Foundations, you can build much faster with less manpower
Complete more projects
With GroundPlug® Screw Pile Foundations, you can build much faster with less manpower
Complete more projects
With GroundPlug® Screw Pile Foundations, you can build much faster with less manpower
Previous slide
Next slide

Avoid Labour shortage

Installing GroundPlug® Screw Piles only requires minimal manpower.
  • GroundPlug® Foundations for decks and outbuildings are installed with handheld powertools in minutes.
  • Screw pile foundations are approved via documentation - no need for extra site inspection.
  • Screwpiling involves only minimal site disturbance – fast and easy foundation for difficult accessible areas.
Step 1
Build and level your foundation frame
Step 2
Install and mount your GroundPlug® Screw Piles
Step 3
Your foundation is ready
Previous slide
Next slide

Effective contruction process

Screw Piles will save you significant construction time.
  • Screw piles take a fraction of the time to install compared to concrete.
  • Screw piles are easily screwed into the ground without prior excavation work.
  • GroundPlug® Screw Piles require no drying time - work can continue immediately.

Avoid Labour shortage

Installing GroundPlug® Screw Piles only requires minimal manpower.
  • GroundPlug® Foundations for decks and outbuildings are installed with handheld powertools in minutes.
  • Screw pile foundations are approved via documentation – no need for extra site inspection.
  • Screwpiling involves only minimal site disturbance – fast and easy foundation for difficult accessible areas.

Effective contruction process

Screw Piles will save you significant construction time.
  • Screw piles take a fraction of the time to install compared to concrete.
  • Screw piles are easily screwed into the ground without prior excavation work.
  • GroundPlug® Screw Piles require no drying time – work can continue immediately.
Step 1
Build and level your foundation frame
Step 2
Install and mount your GroundPlug® Screw Piles
Step 3
Your foundation is ready
Previous slide
Next slide

GroundPlug® Screw Piles come in many sizes to suit your specific project

Get a Quote

Send us your project and get your quote within 48 hours.

Get 10% off

Create an account and get 10% off all your orders.

Find out more

Send a message, we are ready to help.

Select one or more options

If you do not know your soil conditions, remove the top 12 inches of the soil layer and take a sod of the soil you find below.

(If nothing is indicated, we calculate for stiff clay by default)

Attach file
Attach file
Attach file

Select one or more options

If you do not know your soil conditions, remove the top 12 inches of the soil layer and take a sod of the soil you find below.

(If nothing is indicated, we calculate for stiff clay by default)

Attach file
Attach file
Attach file

Select one or more options

If you do not know your soil conditions, remove the top 12 inches of the soil layer and take a sod of the soil you find below.

(If nothing is indicated, we calculate for stiff clay by default)

Attach file
Attach file
Attach file

Lost your password? Please enter your username or email address. You will receive a link to create a new password via email.

Be inspired by other projects

753,5ft2 + 215,3 ft2
Wooden deck in several levels.
“We chose GroundPlug® Foundations because they are easy to level and it is very windy where we live.”
– Peter, Denmark
Previous slide
Next slide
Previous slide
Next slide
753,5ft2 + 215,3 ft2 wooden deck in several levels.
“We chose GroundPlug® Foundations because they are easy to level and it is very windy where we live.”
– Peter, Denmark
X

Large Construction & Infrastructure

Did you know that GroundPlug has the market’s largest range of steel foundations?

Have a look at our series for multi-storey construction, infrastructure and industrial construction.